TITLE: 08/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 4mph Gusts, 2mph 5min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.05 μm/s
QUICK SUMMARY:
Injections finished at 14:39UTC
Inlock charge measurements start at 14:45UTC
Inlock charges are having an ezca connection error, can't connect to H1:SUS-ITMX_L3_DRIVEALIGN_L2L. I've stopped to OP STOP and EXEC as suggested by the log but it gets the same error everytime. The inlock charge measurements were not able to be completed