Displaying report 1-1 of 1.
Reports until 16:09, Tuesday 01 August 2023
H1 General
ryan.crouch@LIGO.ORG - posted 16:09, Tuesday 01 August 2023 (71865)
OPS Tuesday day shift summary

TITLE: 08/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
SHIFT SUMMARY:

Decently busy maintenance day, Model changes (PCAL, ISIs), DAQ restart, CP1 thermocouple, turbopump test, SQZT0 table work, OMC measurement... Handing off to Corey

Lockloss at 15:16 for the start of maintance activities.

Lock#1:

Yarms power was lower than usual and oscillating a bit but we were still experiencing some shaking from local EQs. During Find_IR it was complaining about Yarm alignment being bad and not searching due to it, I tried to touch up Yarm but it lost lock.

Lock#2:

Yarm went through increase flashes and locked at a normal looking power and had no issues finding DIFF_IR.

We got back into NLN at 21:30UTC and had to wait for; ADS to converge, a potential issue with the new CAL lines to be investigated, and a squeezing issue to be investigated. Back into Observing at 22:02UTC

We dropped out of Observing again at 22:11UTC for a PCAL Y issue that was noticed, back in Observing at 22:16UTC.

LOG:                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
15:04 FAC Karen EndX N Tech clean 16:04
15:12 FAC Cindy HAM shack N Tech clean 16:05
15:16 VAC Travis LVEA N CP1 thermocouple 16:41
15:27 VAC Jordan LVEA N Join Travis CP1 17:25
15:28 EE Fil LVEA N Check with Travis 16:30
15:38 ISC Jason FCES N Find alignment equipment 15:48
15:44 FAC Richard LVEA N check out VAC racks 16:04
15:45 CAL Tony PCAL lab LOCAL PCAL work 22:35
15:52   Rick +1 LVEA N Quick tour 17:06
15:54 VAC Gerardo LVEA Y Join CP1 thermocouple crew 18:23
16:05 FAC Cindy High bay N Tech clean 16:31
16:05 SEI Jim LVEA N HAM1 checks 16:41
16:13 SQZ Sheila, Briana LVEA, SQZT0 LOCAL Table work 17:10
16:17 FAC Christina OSB, Ends, FCES N Move water pallets 17:49
16:29 ISC Keita LVEA N Check board connections, connect if necissary 16:36
17:05 CDS Erik Ends, X then Y N Stage a setup 18:08
17:10 SQZ Sheila LVEA N Laser hazard transition 17:29
17:23 EE Fil + APS LVEA Y Bring APS around H2, output arm 19:05
17:29 SQZ Sheila, Naoki, Genevieve, Briana LVEA, SQZT0 Y Table work, alignment 19:27
17:30 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 19:45
17:50 FAC Christina LVEA Y Checks 18:02
17:06 FAC Cindy LVEA Y Tech clean 18:07
18:33 VAC Jordan LVEA Y Turn off turbopumps 18:40
18:34 ISC Keita LVEA Y Undo connection 18:36
19:31 FAC TJ LVEA Y Sweep 19:48
20:02 SQZ Sheila LVEA N Undo changes 20:07
21:08 VAC Gerardo MidX N Turn on a compressor 21:32
20:50 SEI Jim LVEA N Grab something by ham1 in @ 20:50 21:09
21:42   Jim & Mitch Mids N Parts hunt 22:25
Displaying report 1-1 of 1.