TITLE: 08/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY: Lots of squeeze work today, and some other comissioning items (HAM1FF, CHARD_Y controller, contrast defect...), handing off to Corey with a locktime of 15:06
From 15:00 to 16:00 there was some work going on in the MSR, including moving items and cables (tagging DetChar). The MSR racks' 1 & 2 temperatures saw an increase in temperatures seeming to correspond with the times the work was being done, rack2 had a sharp increase, but it was colder than nominal beforehand and now seems to have settled around its nominal temperature (22C).
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 17:05 | FAC | Cindy | MidX | N | Tech clean | 18:23 |
| 18:10 | FAC | Karen | Vac prep | N | Tech clean | 18:50 |
| 18:16 | FAC | Ken | MidY | N | Change light bulbs | 22:31 |
| 16:00 | SQZ | Vicky, Sheila, Naoki | CR/Remote | N | SQZ work started at 1600 | 20:13 |
| 19:48 | PCAL | Tony | PCAL LAB | Local | PS5_PS1(TSA) Responsivity Ratio measurement | 22:20 |
| 21:34 | VAC | Gerardo & Richard | MidY | N | Take a picture of CP4 | 22:07 |
| 22:04 | SEI | Jim | CR | N | HAM1 FF | 22:14 |
| 22:13 | SUS | Rahul | Remote | N | 1.5kHz modes | 23:02 |
| 22:39 | CAL | Gabriele | Remote | N | CHARD_Y controller, and other measurements | Ongoing |