TITLE: 08/03 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
SHIFT SUMMARY:
Arrived to H1 almost done with NOMINAL LOW NOISE and finishing out COMMISSIOING time by Louis.
Random lockloss 2hrs into the shift.
Relocked with no issues, exept the SUSETMx had calibration line related diffs (see earlier alogs).
LOG:
- Came in with H1 waiting for ADS lines to converge and Louis doing commissioning work for Calibration lines
- See earlier alogs for issues with SDF diffs for SUSETMX
- We hope for the next lock these issues were addressed. If not, please look at what values should be used from Louis' alogs.
- 0003 Went to OBSERVING
- 0058 LOCKLOSS (there was an earthquake alert, but I did not see anything obvious EQ-wise around the lockloss nothing on tidal scope, picketfence or seis_blrms])
- 0249 OBSERVING