Reports until 20:22, Tuesday 23 July 2013
H1 AOS
lisa.austin@LIGO.ORG - posted 20:22, Tuesday 23 July 2013 (7195)
SLC - Manifold Cryopump assembly and installation & Arm Cavity Baffle assembly
Mitchell Robinson, Scott Shankle, Thomas Vo -

Arm Cavity Baffle Suspension Assembly is complete and ready to suspend.
Baffle Box assembly is in process.

-----------------------------------------------

Mitchell Robinson, Scott Shankle, Apollo's Randy and Scott -

All participants reviewed the Installation Procedure and the Hazard Analysis.
The Manifold Cryopump Baffle was brought down from the Balancing Fixture.
The Flange Protectors and Baffle Alignment Tooling were attached to the spool.
Yet, this baffle continues to be a complete pain in the derriere -
the newly fabricated Spacer/Shim's holes are too small.
Team will be looking into the feasibility of a clean modification.

----------------------------------