Reports until 16:18, Sunday 06 August 2023
H1 General
oli.patane@LIGO.ORG - posted 16:18, Sunday 06 August 2023 (72015)
Ops DAY Shift End

TITLE: 08/06 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Austin
SHIFT SUMMARY:

Currently working through an inital alignment

 

15:00UTC Detector down due to power glitch at 13:34UTC; Ryan S going to CER to turn High Voltage back on (72000)

15:15 Relocking
- Had issues with relocking because the OMC High Voltage PZT were not reset after the power outage (72003)
17:43 Continuing up
18:05 NOMINAL_LOW_NOISE
18:28 Observing

20:33 Earthquake mode activated
20:44 Back to CALM

22:28 Lockloss (72010)


LOG:                                                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
13:54 OPS Ryan S HEADING TO SITE - Investigating PSL issue 14:54
14:56 PSL Ryan S CER - Turning on PMC HV 15:23
17:11 OMC Oli LVEA n Turning HAM6 High Voltage back on 17:52