Justin B. covered from ~ 9 - 10:30 08:30 HFD onsite flushing hydrant lines 08:50 Jim B. to end X to swap Dolphin cables on SUS, SEI and ISC 09:27 Mark B./Arnaud P. restarting the BS model 09:31 Terra H. moving clean room @ HAM 4 to facilitate running cables 09:48 Mayflower Metals here to see Ski 09:57 Dave B. power cycling SUSB123 (ETMY & BS) 10:30 Justin B. to H2 PSL enclosure to help PCAL 11:11 HFD done work 12:20 Pablo D. left H2 PSL enclosure 12:22 Richard M. to LVEA to help students with equipment 12:30 Fires spotted off in the distance past end X 12:47 Richard M. out of LVEA 12:55 Filiberto C. climbing on HAM 2 to pull accelerometer cables 14:00 Filiberto C. done 14:43 Pablo D. to H2 PSL enclosure