Reports until 17:27, Wednesday 24 July 2013
H1 AOS
lisa.austin@LIGO.ORG - posted 17:27, Wednesday 24 July 2013 (7209)
SLC - Manifold Cryopump assembly and installation
Mitchell Robinson, Scott Shankle, Apollo's Randy and Scott -

The Baffle assembly has been completed. The Bracket Shim is in place.
The Ring has been assembled, installed and aligned in the spool.
The Spring Blades are attached to the Top Ring.

The baffle is ready to lift and install!