anthony.sanchez@LIGO.ORG - posted 16:05, Wednesday 09 August 2023 (72114)
Wednesday Ops Day Shift End

TITLE: 08/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Tony
INCOMING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 17mph Gusts, 13mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.08 μm/s
QUICK SUMMARY:

Comissioners started running test and injections early this morning.

RO Alarm from H0:FMC-CS_WS_RO_ALARM 16:26 UTC

FIRE DRILL Lockloss 17:00 UTC  
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=72097

Relocking started while everyone was out side 17:02 UTC
NOMINAL_LOW_NOISE reached at 17:58 UTC
Camera servos finished at 18:11 UTC

Comissioners spent most of the day doing PEM Injections and ASC Open loop measurements.

22:51 UTC Lockloss Unknown cause 10 minutes before Hand off to Ryan C.
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=72112


Current IFO Status relocking in AQUIRE_PRMI                                                                                                                                                                                                                                                                                                                                                             

Start Time System Name Location Lazer_Haz Task Time End
15:52 PEM Robert Ctrl Rm N PEM Injections 17:54
15:56 PEM Robert LVEA N PEM Injection setup 16:33
16:41 Electric Ken Mid Y n Replacing lights 22:02
16:42 FAC Cindy MEchanical Room N technical cleaning. 17:54
19:07 FAC Cindi H2 N Technical cleaning 19:20
19:20 PEM Robert Ctrl Rm N PEM Injections 21:20
19:55 ASC Elena Ctrl Rm N ASC Open Loop Gain Measurements 20:27
20:11 EE Fil PCAL Lab Local Installing a Laser stop button 22:11
21:09 Tour jenne & Co. Roof n Tour which includes a View from the roof.  21:39
21:53 PEM Robert EX N Setting up PEM Injections 22:53

 