LHO General
thomas.shaffer@LIGO.ORG - posted 16:26, Tuesday 15 August 2023 (72251)
Ops Day Shift Summary

TITLE: 08/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Tony
SHIFT SUMMARY: A slightly longer maintenance day and then a few small issues that have us just now finishing up initial alignment. After maintenance activities were done and we started initial alignment, it was noticed that the sidebands were not turned back on. After they where turned back on we were still not able to get through the INPUT_ALIGN state. We could very briefly catch but then the IMC would lose lock. This ended up being because the H1:LSC-POP_A_RF45_I_OFFSET needed to be changed from -72 to -68 during this state. This offset is for during this state as we change the whitening for POP A during this particular part of initial alignment away from its nominal setting.

Before this offset was found, I had run the dark offset script, but I forgot that our POP A whitening was in the initial alignment setting. I manually changed and re-accepted these back to where they were.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:31 FAC Karen EX n Tech clean 17:28
15:31 FAC Randy EY n Cleanroom curtains 18:22
15:32 FAC Cindi FCES n Tech clean 17:18
15:32 CDS/SEI Jim HAM1 n HAM1 model restart 15:52
15:33 CDS Dave remote n OAF model restart 15:43
15:37 SEI Jim LVEA-HAM1 n HAM1 HEPI accumulator swap 15:52
15:40 TCS Camilla Mech room n TCS chiller swap 16:10
15:41 FAC Chris EY, MY, CS, MX, EX n FAMIS checks 16:49
15:45 PSL Jason, Ryan CR n PMC ref cav alignment 16:21
15:47 SEI/CDS Fil EX n Cabling for SEI HEPI 17:47
15:52 SEI Jim EX n Replace zerks 16:35
16:05 PEM Robert, Lance, Genevieve LVEA, EY n Move shaker from LVEA to EY 17:55
16:14 TCS Camilla LVEA N Turn on CO2 lasers after chiller swap 16:35
16:28 PCAL Rick, Julianna, Tony EX YES PCAL measurement 18:43
16:53 FAC Christina FCES n Property search 19:22
17:02 CDS f2f tour group LVEA, roof n Tour 18:04
17:13 CC Mitch, Ibrahim Ends - Dust monitor famis check 17:56
17:19 FAC Cindi, Karen LVEA n Tech clean 18:52
17:41 SUS Jeff EX n TMSX measurement 18:59
17:55 PEM Robert EX, EY n Moving equipment from EX to EY 19:06
18:04 VAC Janos, Gerardo outbuildings, LVEA n Checks (started around 1530) 18:40
18:06 CDS Fil EY n SEI HEPI cabling 19:02
18:10 ISC Keita CR n OM2 measurement 19:40
22:11 VAC Gerardo, Janos LVEA n Grab equipment 22:20