Displaying report 1-1 of 1.
Reports until 16:07, Thursday 25 July 2013
LHO General
justin.bergman@LIGO.ORG - posted 16:07, Thursday 25 July 2013 (7227)
ops

0800 Found multiple IPC errors on H1SEIB1,H1SEIB2,H1SEIB3---all resulting from some kind of hiccup from H1SUSB123. I reset all the IPC errors and they did not recur during the shift.

900-1030 Patrick covering; notes increasing dust counts between HAM2/3 where the cleanroom had temporarily been turned off

950 MarkB and Arnaud investigating noise on BS

950-1030  Richard disconnecting coil driver sensors on BS (DaveB running IOP bypass on SUSB123 and SEIB2)

1200 Problems with PSL refcav...Stefan/Rick investigating

1343 Frank and Luis to EY to work on racks (not working in laser hazard zone)

1400 During BS noise investigations the watchdogs were tripped for ISI-ITMY and ISI-BS. Hugo/Justin reset ITMY but found the BS suspension had Master Switch toggled (Richard) and we did not reset these WDs

1405 Colin/Pablo continuing Pcal alignment in H2 Enclosure

1425 Undergrad Andres Mellina notified operator that he would be energizing the NPRO in OSBOL per WP#4048---agreed to complete work and notify operator by 1600. Did not anticipate needing more than 5mW.

1539 Operator notified by Andres that laser work complete for the day in OSBOL.

Displaying report 1-1 of 1.