Reports until 16:00, Friday 18 August 2023
LHO General
austin.jennings@LIGO.ORG - posted 16:00, Friday 18 August 2023 (72316)
Friday Operator Summary

TITLE: 08/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

- EX saturation @ 16:47

- Lockloss @ 17:36 - cause unknown

- Locking was automated, acquired NLN @ 18:41, OBSERVE @ 18:57

- Lockloss @ 18:57 - cause uknown, though microseism is a bit elevated - scope attached

- H1 MANAGER began an IA which went smoothly, but are now having some issue with the IMC randomly unlocking at different states of ISC LOCK

- Leaving H1 to Ryan S. relocking at MOVE SPOTS

LOG:                                                                                                                                                                                                                                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
15:11 ISC Robert CR N HVAC tests 17:41
17:03 PEM Robert EY N Check on pump 17:22
18:14 FAC Cindy Mech room N Tech clean 19:05
18:29 SEI Jim LVEA N Checks 19:00
19:47 PEM Robert EX N Work on water pump 21:33
21:53 VAC Gerardo LVEA N Grab parts 22:18
Images attached to this report