Displaying report 1-1 of 1.
Reports until 16:00, Tuesday 22 August 2023
H1 General
ryan.crouch@LIGO.ORG - posted 16:00, Tuesday 22 August 2023 (72369)
OPS Tuesday day shift summary

TITLE: 08/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 141Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

Lock#1:

Yarm locked at a low power (~75%, lower power than XARm) and oscillating, no flashes at DRMI or PRMI, CHECK_MICH lockloss. There was a few more LL at FIND_IR and LOCKING ALS so I did an Initial Alignment, which went well untill we got to SRC where it tried for a while then eventually gave me a message "find by hand" where I tapped on SRM in Pitch maybe 10 microradians to maximize the signal and it was enough to push it onwords and finish IA.

Yarm looked better after the IA but was still oscillating, during these troubles the Norco liquid nitrogen truck was filling CP1 but we weren't seeing any extra motion on the CS accelerometers that we looked at.

Reached NLN at 21:25UTC, I had some sus SDF diffs pop up, they were all TRAMPs so I accepted them on SUSTMSX & SUSETMX. The 102Hz peak was noticable at the start of the lock.

In Observing at 21:45UTC, our range is lower now this lock

LOG:                                                                            

Start Time System Name Location Lazer_Haz Task Time End
14:57 PCAL Tony, Rick EndX Y PCAL measurement 18:56
14:59 FAC Chris Mech room N Fan room1 15:19
15:00 FAC Karen EndY N Tech clean 16:23
15:01 FAC Cindy FCES N Tech clean 16:20
15:04 EE Ken MidX N Light fixtures 21:54
15:17 FAC Mitch West bay N Parts dropoff 19:55
15:29 FAC Chris Bake lab N Check out fume hood for removal 15:44
15:37 DAQ Dave remote n restart nds1 19:24
15:49 FAC Chris MidX N Bring Ken a scissor lift 16:43
15:49 PSL Jason PSL Anteroom LOCAL Inventory 17:48
15:53 SQZ Vicky Remote N SQZ maintenance 17:50
16:09 EE Fill LVEA N Wiring 17:24
16:28 VAC Janos, Travis EndY, LVEA N Measurements 18:31
16:36 EE Marc CER N Check out power supplies with lasers 16:51
16:38 FAC Cindy LVEA N Tech clean 18:41
16:39 SEI Jim CR N HAM8 transfer functions, HAM7 18:23
16:55 FAC Mitch, Ibrahim Staging, Enclosure N Move laser blinds 19:24
16:50 FAC Karen LVEA N Tech clean 18:20
16:58 FAC Chris LVEA N FAMIS checks 17:23
17:24 FAC Chris FCES N FAMIS checks 17:47
17:26 EE Fil EndY, then EndX N ESD upgrade checks 19:05
18:29 FAC Karen EndY N Drop off supplies 18:56
18:41 FAC Cindy High bay N Tech clean 18:58
21:05 VAC Janos, Travis EndX N Investigate anulus pump 21:30
21:09 PCAL Tony PCAL lab LOCAL PCAL post end station work 23:09
Images attached to this report
Displaying report 1-1 of 1.