TITLE: 08/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 141Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Lock#1:
Yarm locked at a low power (~75%, lower power than XARm) and oscillating, no flashes at DRMI or PRMI, CHECK_MICH lockloss. There was a few more LL at FIND_IR and LOCKING ALS so I did an Initial Alignment, which went well untill we got to SRC where it tried for a while then eventually gave me a message "find by hand" where I tapped on SRM in Pitch maybe 10 microradians to maximize the signal and it was enough to push it onwords and finish IA.
Yarm looked better after the IA but was still oscillating, during these troubles the Norco liquid nitrogen truck was filling CP1 but we weren't seeing any extra motion on the CS accelerometers that we looked at.
Reached NLN at 21:25UTC, I had some sus SDF diffs pop up, they were all TRAMPs so I accepted them on SUSTMSX & SUSETMX. The 102Hz peak was noticable at the start of the lock.
In Observing at 21:45UTC, our range is lower now this lock
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:57 | PCAL | Tony, Rick | EndX | Y | PCAL measurement | 18:56 |
14:59 | FAC | Chris | Mech room | N | Fan room1 | 15:19 |
15:00 | FAC | Karen | EndY | N | Tech clean | 16:23 |
15:01 | FAC | Cindy | FCES | N | Tech clean | 16:20 |
15:04 | EE | Ken | MidX | N | Light fixtures | 21:54 |
15:17 | FAC | Mitch | West bay | N | Parts dropoff | 19:55 |
15:29 | FAC | Chris | Bake lab | N | Check out fume hood for removal | 15:44 |
15:37 | DAQ | Dave | remote | n | restart nds1 | 19:24 |
15:49 | FAC | Chris | MidX | N | Bring Ken a scissor lift | 16:43 |
15:49 | PSL | Jason | PSL Anteroom | LOCAL | Inventory | 17:48 |
15:53 | SQZ | Vicky | Remote | N | SQZ maintenance | 17:50 |
16:09 | EE | Fill | LVEA | N | Wiring | 17:24 |
16:28 | VAC | Janos, Travis | EndY, LVEA | N | Measurements | 18:31 |
16:36 | EE | Marc | CER | N | Check out power supplies with lasers | 16:51 |
16:38 | FAC | Cindy | LVEA | N | Tech clean | 18:41 |
16:39 | SEI | Jim | CR | N | HAM8 transfer functions, HAM7 | 18:23 |
16:55 | FAC | Mitch, Ibrahim | Staging, Enclosure | N | Move laser blinds | 19:24 |
16:50 | FAC | Karen | LVEA | N | Tech clean | 18:20 |
16:58 | FAC | Chris | LVEA | N | FAMIS checks | 17:23 |
17:24 | FAC | Chris | FCES | N | FAMIS checks | 17:47 |
17:26 | EE | Fil | EndY, then EndX | N | ESD upgrade checks | 19:05 |
18:29 | FAC | Karen | EndY | N | Drop off supplies | 18:56 |
18:41 | FAC | Cindy | High bay | N | Tech clean | 18:58 |
21:05 | VAC | Janos, Travis | EndX | N | Investigate anulus pump | 21:30 |
21:09 | PCAL | Tony | PCAL lab | LOCAL | PCAL post end station work | 23:09 |