After a long morning, I was able to check out HAM6's sensors, re-gap a couple CPS's, float the ISI, adjust lockers and plug everything in. Surprisingly, no locker shim adjustments were needed (every aLIGO ISI has needed small adjustments) and all other adjustments went smoothly. No major issues, but the corner 2 and 3 GS-13's are swapped. I didn't check to see if the in-air cabling at the chamber is swapped, yet, but I'm pretty sure of the in-vac cables. I've attached power spectra for CPS's and GS-13's, as well as an MEDM snapshot.