Reports until 15:59, Tuesday 29 August 2023
H1 General (PSL)
ryan.crouch@LIGO.ORG - posted 15:59, Tuesday 29 August 2023 (72511)
OPS Tuesday day shift summary

TITLE: 08/29 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

PSL anteroom (101) dust counts have been elevated throughout the day, related alog72507. The EY chiller work continued into the afternoon, and the annulus pump was left on at EX till 21:00UTC. We struggled to relock today after maintenance.

Lock#1:

No flashes during DRMI or PRMI, lost it during CHECK_MICH_FRINGES

Lock#2-6:

Lock#7-12:

We survived to PARK_ALS_VCO but then lost it again from Xarm. So this isn't an ALS issue, since ALS isn't used anymore at this point.

We lost lock at DMRI_LOCKED_PREP_ASC twice without the Xarm issue happening.

After several more attempts and a few more set of eyes looking at the IFO we were able to slowly step up to a higher state and it got to PREP_ASC where we decided to just request NLN and let it go. Lost lock at CHECK_VIOLINS at 21:40UTC.

We continued to struggle at ALS, IR, and DRMI, but after a bit we were able to make it up to ADS_TO_CAMERAS where we are as of 23:00UTC

LOG:                                                     

Start Time System Name Location Lazer_Haz Task Time End
15:00 FAC Karen EndX N Tech clean 16:09
15:02 FAC Cindy FCES N Tech clean 15:55
15:08 OAF Dave Remote N WP11387: New h1oaf and h1bos models for Jenne, no DAQ restart 18:31
15:09 PEM Dave Remote N WP11393: New h1pemcs model for Cosmic Ray, DAQ restart is required 18:31
15:10 DAQ Dave Remote N WP11391: Restart DAQ to enable MD5 checksum file generation, pemcs changes, and possibly Beckhoff changes 18:32
15:12 OPS Oli LVEA N Quarterly DM checks 15:56
15:16 VAC Jordan MidY, EndY N Turbo pump tests 17:26
15:28 FAC Tyler + Mac Miller EndY N Chiller investigation 18:00
15:32 VAC Gerardo LVEA N Grab parts 15:41
15:41 FAC Mitch LVEA B Checks 16:20
15:42 VAC Janos, Gerardo EndX N Annulus pump replacement 18:04
15:48 FAC Chris LVEA N FAMIS checks 16:38
15:49 SQZ Vicky LVEA LOCAL SQZT7 LOCAL HAZARD work 18:33
15:58 OPS Oli FCES N DM checks 16:33
16:00 EE Fil CER N Inventory 18:54
16:08 SEI Jim CR N HAM1 TFs 17:51
16:09 FAC Karen MidX, beamtube N Tech clean 16:47
16:12 EE Marc CER N Cosmic ray detector 18:54
16:39 FAC Chris EndY, then X N FAMIS checks 17:41
16:40 FAC Mitch, Randy LVEA N Craning HEPI piers 18:50
16:45 OPS Oli, Richard Ends N DM checks, PA checks 17:40
16:47 SQZ Sheila LVEA LOCAL SQZT7 work 18:33
16:51 EE Ken MSR N Lights 20:51
17:06 FAC Cindy LVEA N Tech clean 18:37
17:08 CDS Patrick Office N Camera servo updates 17:33
17:58 SQZ Naoki LVEA LOCAL SQZT7 work 18:32
18:04 VAC Jordan, Janos LVEA N Check hepta line 18:48
18:19 EPO Jeff + Tour LVEA N Tour 19:05
18:41 PEM Lance LVEA N Check a bolt 18:50
18:30 FAC Cindy High bay N Tech clean 18:49
18:51 VAC Gerardo FCES N Measurements 19:11
20:38 SQZ Vicky, Sheila LVEA LOCAL SQZT7 pd alignment check 21:06
20:57 VAC Gerardo Xarm N Check on annulus pump 22:06
21:46 CAL Tony PCAL lab LOCAL PCAL work 23:46
22:18 FAC Tyler + 1 SIte, EndY N Site tour, air handlers 23:18
Images attached to this report