FAMIS#23738 (not closing due to PSL check not having been done yet)
Previous check: 68779
**PSL Anteroom and Laser Room will be done at a later date when going in there is required for other tasks.
Location | Dustmon | Zero Count Test | Flow Rate (LPM) | |
---|---|---|---|---|
Corner Station | ||||
LVEA | HAM2 | LVEA 5 | Not in use | |
HAM6 | LVEA 6 | Pass | 2.8 | |
BSC1 | LVEA 10 | Pass | 2.78 | |
PSL | Laser Room | PSL 101 | ** | |
Anteroom | PSL 102 | ** | ||
Labs | Optics Lab | LAB 1 | Pass | 2.8 |
Vacuum Prep Lab | LAB 2 | Pass | adjusted to 2.7 | |
PCAL Lab | LAB 3 | Not in use | ||
Diode Room | Diode Room | DR 1 | Pass | 2.73 |
CER | Handheld 1 | HH1 | Not there | |
Handheld 2 | HH2 | Not there | ||
Handheld 3 | HH3 | Not there | ||
Handheld 4 | HH4 | Not there | ||
Handheld 5 | HH5 | Not there | ||
Outbuildings | ||||
End Stations | EX VEA | EX VEA 1 | Pass | 2.8 |
EY VEA | EY VEA 2 | Pass on 2nd try | 2.7 | |
FCES | HAM8 | HAM8 | Pass | adjusted 2.3 -> 2.7 |