TITLE: 08/29 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 136Mpc
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Standing down for high winds on site for the first half of the shift. Able to relock once wind was quieter and have been observing since. Winds are still high so things are less stable and range is lower.
Tried relocking three times, but could not get past locking ALS due to the (now much higher) wind gusts. Jenne made the call to stand down until the winds died down (alog 72536).
The RO_WATER alarm and EX/EY dust alarms have continued to alarm on/off throughout the shift.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
21:46 | CAL | Tony | PCAL lab | LOCAL | PCAL work | 23:46 |
22:18 | FAC | Tyler + 1 | SIte, EndY | N | Site tour, air handlers | 23:18 |
23:49 | VAC | Janos | EY | - | Circulation measurements | 00:10 |