TITLE: 08/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: One lock loss during the shift that ended a 27 hour lock. Relocking was straight forward but I had to very slightly move ETMY to get ALSY to lock. This was the only locking intervention (outside of a small test). We've now been locked for 1 hour and observing for 45min.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:13 | FAC | Randy | MY | n | Inventory | 18:47 |
15:51 | FAC | Ken | OSB receiving | n | Replacing lights | 22:07 |
17:30 | FAC | Tyler | EY | n | Chiller line work on top of air handler roon | 18:07 |
17:32 | CC/SEI | Mitch | EY, EX | n | FAMIS checks in end station mech rooms | 18:17 |
18:41 | SQZ | Sheila, Vicky | LVEA - SQZ bay | Local | SQZ table alignment | 19:51 |
18:41 | CAL | Jeff, Louis | CR | n | CAL measurement | 19:57 |
19:03 | SEI | Jim | Office | n | HAM1 filter tests | 19:58 |
20:00 | FAC | Tyler | EY | n | More HVAC work on AUR | 20:31 |
21:22 | SEI | Jim | Office | n | HAM7 new filters | 21:40 |