Reports until 08:44, Monday 29 July 2013
H1 General
jeffrey.kissel@LIGO.ORG - posted 08:44, Monday 29 July 2013 (7263)
BSC6 Seismic and Suspensions Turned OFF in Prep for End Station Vent
J. Kissel, A. Pele 

In prep for the shutdown of EY, we've ramped down and turned off all active control requests from BSC6. HPI-BSC6, ISI-BSC6, SUS-ETMY, and SUS-TSMY have all been ramped down, and are now with their master switch turned off.