TITLE: 09/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 143Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
LOG:
Stand Down request went away.
16:00-Ish UTC PI 24 was ringing up again, and it had rung its self up 3 times. on the 4th time
I changed H1:SUS-PI_PROC_COMPUTE_MODE24_PLL_PHASE to a value that would work WITHOUT changing the state of the PI Guardian which allowed me to stay in OBSERVING the entire time.
PI Guardian Needs to be reloaded After Naoki's Changes.
Lockloss 20:45 UTC
PI Guardian was reloaded.
Initial Alignment Not run before locking. But this lock did go through Check Mich fringes.
Observing Reached @ 22:09
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
18:42 | FAC | Tyler | Mech Rm | N | Draining the Air Handler Condensation | 19:12 |