[Daniel, Sheila, Kiwamu]
As a preparation for the ISCTEY migration we went down to EY this morning and cleaned up the exterior cables, some measurement devices and etc.
The light pipes, which had been attached between the ISCTEY enclosure and the viewports on the BSC6 chamber, were also removed. The viewports are now protected by the yellow cover with the lexan guilotine in. The ISC equipments were brought to the squeezer area and some of those beloging to the EE shop were put back to the shop. We removed all the loose parts from the inside of the enclosure so that nothing will move during the transportation.
The belows are pictures of the ISCTEY enclosure taken after the cleaning.