TITLE: 09/06 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: One lock loss at the beginning of the shift, with an automatic relock. We started commissioning at12PT and just got back to Observing.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:56 | FAC | Randy | MX | n | Attending to the HEPI piers | 16:56 |
15:00 | FAC | Karen | MY | n | Tech clean | 16:49 |
16:40 | FAC | Tyler | OSB AHR | n | Check drains for AHU1 | 16:58 |
17:30 | SEI | Jim, Randy | EX | n | Check on BRSX | 18:35 |
18:39 | FAC | Karen | MY | n | Drop off | 19:39 |
19:05 | PEM | Robert, Genevieve, Lance | EX | n | PEM injections | 21:40 |
21:34 | PEM | Lance | LVEA | n | Turn on amp | 21:41 |
22:02 | CAL | TJ | CR | n | Calibration sweep | 22:32 |
22:02 | SQZ | Vicky, Naoki | CR | n | SQZ tuning | 23:02 |