TITLE: 09/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 141Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: We've been locked for 5 hours after a slower lock loss and automated relock. We lost the FMCS EPICs site wide around noon during work to fix the FMCS system.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:00 | FAC | Kim | MX | n | Tech clean | 16:22 |
17:52 | PEM | Robert | LVEA | n | Picture of magnetometer | 18:02 |
18:02 | PSL | Jason | MX | n | Check on container | 18:36 |
20:04 | FAC | Tyler, Contractor | FCES, EY | n | Check on HVAC servers | 20:58 |
22:04 | FAC | Fil, Contractor | MY. EY | n | Connect FMCS system | 22:36 |
22:21 | FAC | Richard | FCES | n | Checking on HVAC servers | 22:36 |
The OPO PZT voltage reached the threshold and the squeezer relocked. After squeezer relock, the BNS range and squeezing level were worse. We tuned the OPO temperature (attached figure) and the range and squeezing level came back.