Displaying report 1-1 of 1.
Reports until 16:07, Thursday 07 September 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:07, Thursday 07 September 2023 - last comment - 16:46, Thursday 07 September 2023(72733)
Ops Day Shift Summary

TITLE: 09/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 141Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: We've been locked for 5 hours after a slower lock loss and automated relock. We lost the FMCS EPICs site wide around noon during work to fix the FMCS system.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:00 FAC Kim MX n Tech clean 16:22
17:52 PEM Robert LVEA n Picture of magnetometer 18:02
18:02 PSL Jason MX n Check on container 18:36
20:04 FAC Tyler, Contractor FCES, EY n Check on HVAC servers 20:58
22:04 FAC Fil, Contractor MY. EY n Connect FMCS system 22:36
22:21 FAC Richard FCES n Checking on HVAC servers 22:36
Comments related to this report
naoki.aritomi@LIGO.ORG - 16:46, Thursday 07 September 2023 (72746)SQZ

The OPO PZT voltage reached the threshold and the squeezer relocked. After squeezer relock, the BNS range and squeezing level were worse. We tuned the OPO temperature (attached figure) and the range and squeezing level came back.

Images attached to this comment
Displaying report 1-1 of 1.