LHO General
austin.jennings@LIGO.ORG - posted 16:01, Friday 08 September 2023 (72752)
Friday Operator Summary

TITLE: 09/08 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Down
INCOMING OPERATOR: Tony
SHIFT SUMMARY:

- EX saturation @ 15:35

- 16:00 - EQ mode activated

- Lockloss @ 16:10 - caused by a Mexico EQ, few sizable aftershocks followed (5.8), holding in READY until ground motion settles

- PEM commissioning work went from 19:00 - 21:00 UTC

- Got back to NLN @ 19:13

- Relocking was autonomous until a 6.8 EQ from Morocco decided to show its ugly face...holding in READY to ride out the ground motion

LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
16:12 PEM Robert EX Y Viewport cover changes 17:14
16:16 FAC Kim H2 N Tech clean 16:46
16:35 FAC Tyler EY N Check pump lines on AHU 17:12
17:12 FAC Tyler CS N Check drip pan 17:15
17:29 SQZ Vicky/Louis SQZ table Y (LOCAL) SQZ alignment 18:32
19:34 PEM Robert EX N PEM commissioning 20:45
19:50 FMCS Bubba EX N Check chiller alarm 20:06
19:58 FAC Tyler EY N Check chiller alarm 20:08
20:18 FAC Bubba LVEA N Test HVAC fans 20:26