TITLE: 09/10 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Lockloss 00:52 UTC https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=72780
Attempt to lock right away was met with a lock loss at PRMI.
Initial alignment started 1:26 UTC After PRMI Lockloss.
Relocking started again at 1:49 UTC.
Nominal Low Noise Reached at 2:35 UTC
Observing Reached at 2:48 UTC
GRB-Short E436485 standing down
6:47 UTC unknown Lockloss. https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=72782
Current Status: Relocking, and in PRMI_ASC