TITLE: 09/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: Austin
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 3mph Gusts, 2mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.11 μm/s
QUICK SUMMARY: Locked for 22 hours. Ground motion has just calmed down from a 6.3M earthquake from Taiwan. PEM injections and SUS charge measurements have finished up, maintenance has started.