Reports until 16:18, Wednesday 13 September 2023
LHO General
thomas.shaffer@LIGO.ORG - posted 16:18, Wednesday 13 September 2023 (72864)
Ops Day Shift Summary

TITLE: 09/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Locked for 15.5 hours, we just finished up 4.5 hours of commissioning and calibration time.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:03 FAC Randy, Tyler MX, MY n Craning, moving equipment 17:26
16:10 FAC Karen Opt Lab n Tech cleaning 16:12
18:24 FAC Randy MY n Picture of chiller 19:20
18:39 CAL TJ CR n Running CAL sweep 18:59
19:05 ISC Jenne CR n FF measurement 20:24
19:53 FAC Tyler EY n Check line pressures on the mezzanine 20:25
21:59 SQZ Vicky Remote n SQZ injections, measurements, and more 23:00
22:25 VAC Gerardo, Jordan EY n Cleaning up glycol spill 23:02