Started fluid draining this morning and today got 8 liters out. Also, all the HEPI electronics at the Piers were removed and all the Actuators were disconnected from the Crossbeam Feet. Actuator lock-down is ongoing. Additionally, most of the ISI cabling sans EM Actuators were disconnected from the chamber and the CPS racks brought down. Greg & Hugh