TITLE: 09/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 147Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Relocking after the lockloss (72911) was a bit strange but seemed like a one-off. Rest of the day was quiet.
15:00UTC In Observing, have been Locked for 18hours
16:38 Lockloss (72911)
16:51 LOCKLOSS_PRMI during third time going through ACQUIRE_PRMI, took itself to DOWN and restarted
17:02 I took it into INITIAL_ALIGNMENT
17:32 INITIAL_ALIGNMENT completed, heading to NOMINAL_LOW_NOISE
17:42 Lockloss at OFFLOAD_DRMI_ASC
18:24 Reached NOMINAL_LOW_NOISE
18:41 Into Observing
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
20:42 | Austin+1 | LExC, OSB, Overpass | n | tour | 22:04 |