Reports until 16:07, Wednesday 20 September 2023
LHO General (DetChar)
ryan.short@LIGO.ORG - posted 16:07, Wednesday 20 September 2023 (72992)
Ops Day Shift Summary

TITLE: 09/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Austin
SHIFT SUMMARY: H1 was unlocked for most of the morning following an earthquake, then commissioning time this afternoon. One commissioning-caused lockloss has H1 currently relocking.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:55 PEM Mitchell EX, EY - Dust monitor vacuum pump checks 16:39
15:59 FAC Bubba OSB - Driving forklift 16:15
17:04 ISC TJ CR - Testing FIND_IR updates 17:16
18:44 S&K Elec Ken FCTE - Add exit signs, to middle and LVEA side of FC tube enclourse 21:33
19:59 ISC Keita LVEA - Switch OM2 cabling 20:06
20:15 ISC Jenne CR - FF testing 20:53