Displaying report 1-1 of 1.
Reports until 16:18, Saturday 23 September 2023
H1 General
anthony.sanchez@LIGO.ORG - posted 16:18, Saturday 23 September 2023 (73071)
Saturday OPS Day Shift End

TITLE: 09/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

19:02 UTC Pi 24 Ring up.
19:11 UTC a few seconds after I found the right setting to bring PI24 down a lockloss happend.


relocking notes:
Xarm Increase Flashes ran. Lockloss at Locking ALS.


Relocking attempt 2
20:19 UTC Nominal Lownoise reached
20:34 UTC Lockloss before the Camera Servos turned on.

relocking attempt 3
started at 20:36 UTC
Nominal Low Noise Reached at 21:20 UTC
Observing Reached at 21:34 UTC

LOG (Testing site independent Reservation system) :                                                                                           

Start Time System Name Location Lazer_Haz Task Time End
16:34 test test test test test 16:35