Displaying report 1-1 of 1.
Reports until 16:14, Monday 25 September 2023
H1 General
anthony.sanchez@LIGO.ORG - posted 16:14, Monday 25 September 2023 (73094)
Monday Ops Eve Shift End

TITLE: 09/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
PSL_ISS reflected power is still low

NonSens Noise measurement while LLO is relocking.
17:00 UTC  H1:OAF-NOISE_WHITENING_GAIN was brought to 1
17:42 UTC H1:OAF-NOISE_WHITENING_GAIN was brought back to 0
and we went back to Observing

19:00 UTC EV Charging Station repairman arrived to Install a new modem for the Charging station.

MicroSeism Finally platteau'd about 2 hours ago.


LOG:                                                                                                                                                                                                                                                                   

Start Time System Name Location Lazer_Haz Task Time End
15:00 FAC Karen Optics-Lab N Technical Cleaning 15:27
15:35 FAC Tyler AirHandlerU1 N Air temp check 15:41
15:52 FAC Kim Mid X N Technical cleaning 16:49
15:52 FAC Karen MidY N technical Cleaning 17:12
16:58 Commish Jenne Remote N NonSens gain increased for 1 hour 17:58
17:14 FAC Chris CER N getting a \ 17:24
17:53 FAC Cindi Woodshop N Technical Laundry 18:30
18:00 FAC Karen MID Y N Putting an Extension cord back. 18:08
18:30 FAC Cindi OSB Receiving N unloading cardboard 18:44
Images attached to this report
Displaying report 1-1 of 1.