Reports until 00:32, Tuesday 26 September 2023
H1 General (SQZ)
oli.patane@LIGO.ORG - posted 00:32, Tuesday 26 September 2023 (73100)
Ops EVE Shift End

TITLE: 09/26 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Austin
SHIFT SUMMARY:

High microseism made it very hard to relock the detector once we lost lock at 09/26 01:26UTC(73096). After losing lock on our way up 8 different times, I put the detector in DOWN for half an hour in the hopes that the microseisms would start trending down and allow us to lock, and that next lock attempt we made it up to NOMINAL_LOW_NOISE.

Once we got back to NLN, DIAG_MAIN was saying that the ISS pump was off, and we took OPO to LOCKED_CLF_DUAL_NO_ISS and then requested SQZ_MANAGER to FREQ_DEP_SQZ, Vicky and I noticed that the OPO still couldn't catch, so we lowered the opo_grTrans_setpoint_uW from 80 to 70 for the night and reloaded OPO (based on 70050). OPO caught and FDS turned on and we automatically went into Observing, but since the temp setpoint hadn't been adjusted (like it says to do in the log), our range was low so we briefly went back out of Observing to try and adjust it. We got it the best that we could, accepted SDF diffs, and got back into Observing at 06:59UTC.

Microseism does look like it is finally starting to turn around(attachment2).


LOG:

23:00UTC Detector Observing and Locked for 35hours, useism very high at 0.67um/s due to storm off the coast of Washington

01:26 Lockloss (73096)

01:57 Lockloss from ACQUIRE_DRMI_1F, starting INITIAL_ALIGNMENT
02:48 INITIAL_ALIGNMENT complete, heading to NOMINAL_LOW_NOISE; useism = 0.83um/s

02:53 Lockloss from ALIGN_RECYCLING_MIRRORS
02:56 Lockloss from FIND_IR
03:04 Lockloss from ACQUIRE_DRMI_1F
03:12 Lockloss from ENGAGE_DRMI_ASC
03:17 Lockloss from FIND_IR
03:23 IR(DIFF) was not found - it found it but passed through it
03:30 Lockloss from CHECK_IR while I was adjusting ALS DIFF

03:33 IR was not found - I adjusted ALS DIFF and got it

04:13 Lockloss from TRANSITION_FROM_ETMX
04:28 Lockloss from DHARD_WFS, putting detector in DOWN for 30mins

05:04 Attempting relocking
05:50 NOMINAL_LOW_NOISE
    - SQZ_ISS Pump is off

06:32 Observing

06:43 Out of Observing to adjust OPO temp setpoint for the new opo_grTrans_setpoint_uW
06:59 Back to Observing                                                                                                           

Start Time System Name Location Lazer_Haz Task Time End
0:00 PCAL Tony PCAL Lab y(local) Getting stuff ready for Tuesday 00:30
06:43 SQZ Oli CR n Adjust SQZ OPO temp 07:02
Images attached to this report