Reports until 08:07, Tuesday 03 October 2023
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 08:07, Tuesday 03 October 2023 - last comment - 12:08, Tuesday 03 October 2023(73224)
OPS Day Shift Start

TITLE: 10/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventative Maintenance
OUTGOING OPERATOR: Ryan S
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 4mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.25 μm/s
QUICK SUMMARY:

IFO is DOWN for Planned Tuesday Maintenance

When I arrived, IFO was about halfway through locking.

Was locked for only 3 minutes at NLN and unlocked due to a DCPD Saturation at 14:41 UTC

Dust monitors were sounding and were acknowledged.

 

Comments related to this report
ryan.crouch@LIGO.ORG - 12:08, Tuesday 03 October 2023 (73238)

For the 14:41 lockloss, the signals look fine on the lockloss select tool scopes. The violins also look fine, they were all trending downwards. The OMC_DCPD signals looked interesting, they seem to have been diverging before the lockloss.

Images attached to this comment