TITLE: 10/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
INCOMING OPERATOR: Austin
SHIFT SUMMARY: We've been locked all day 8:30 so far, and just finished up commissioning for the day.
Norco arrived at 15:35UTC and started down Xarm at 15:45 and was parking at MX at 15:54 and was leaving around 17:25.
We started commissioning at 19:00UTC with a calibration sweep (19:03 to 19:33). I also manually restarted NUC26 which had frozen late last night. Robert wrapped up around 22:45UTC form his PEM injections and swept the LVEA as he left.
Camilla made the ring heater changes at 19:35UTC and undid them at 22:35UTC.
Back into observing at 22:46UTC
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:23 | FAC | Karen | Wood shop, fire pump room | N | Tech clean | 18:10 |
17:12 | FAC | Cindi | Weld shop/Laundry | N | Laundry | 19:07 |
17:51 | FAC | Kim | H2 | N | Tech clean | 18:10 |
19:05 | PEM | Robert | LVEA | N | Grab equipment | 19:12 |
19:15 | CAL | RyanC | CR | N | Calibration sweep | 19:34 |
19:16 | PEM | Robert | EndX | N | PEM injection | 20:54 |
19:33 | FAC | Cindi | Wood shop | N | grab supplies | 19:53 |
19:35 | TCS | Camilla | CR | N | Ring heater test | 20:23 |
20:54 | PEM | Robert | CR | N | ITM tests | 21:50 |
21:17 | VAC | Travis, Jordan | Mids | N | Gauge updates | 22:20 |
21:18 | Marc +2 | Roof | N | Tour for new intern | 21:22 | |
21:50 | PEM | Robert | LVEA | N | HAM3 Shaking Tests | 22:47 |