Reports until 12:17, Thursday 05 October 2023
H1 ISC
marc.pirello@LIGO.ORG - posted 12:17, Thursday 05 October 2023 (73292)
Tracking of DC Power Supply runs from Mezannine to the floor.

WP11458 

We completed tracking the final unlabeled power runs in Mezanine rack H1-VDC-C6.  The old cable identification was insufficient to determine exactly where the power was being delivered.  Last Tuesday we verified ISC R3 & R5 supplies +/- 24v and +/- 18V (VDC-C6 U30 & U26).  This week we verified the old SQZ1 has a +/-18V run which is not connected to any chassis at the moment, but is powered on (VDC-C6 U22).  The remaming unidentified power runs (VDC-C6 U18, U14, & U10) were identified to supply H1-ISC-R2 +/-18V and H1-ISC R1 +/-24V, +/-18V.  Rack document has been updated and placed in the DCC. Mystery solved!

D2300167