08:00 Laser Safe Hugh and Apollo working on HEIP at End-Y 08:45 Cory G. to Mid-Y then going to End-X 10:07 Fire Department on site 10:10 Betsy & Travis working on ITM-X 11:35 Dale escorting a group through the LVEA 12:20 Richard M moved the dust monitor controller from under IMC tube to under H2-IMC 13:01 Thomas V End-Y to remove optical level equipment 13:19 Rick S working in the H1-PSL enclosure 13:27 Fire Department back on site 15:32 Betsy & Travis at End-X