Reports until 16:00, Tuesday 10 October 2023
H1 General
anthony.sanchez@LIGO.ORG - posted 16:00, Tuesday 10 October 2023 (73374)
Tuesday Ops Day Shift END


TITLE: 10/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
Tuesday maintenance day recovery went well.
There was a H1:PSL-ENV_LASERRM_ASC_TEMP_DEGF  Channel That isstill getting back to nominal temps in the PSL
The PSL Dust mon has been going off since the wind has started to pick up.
H1 has been locked for 2 Hours and 12 Minutes.
LOG:
                                                                                                                

Start Time System Name Location Lazer_Haz Task Time End
15:05 TCS Camilla CtrlRm n Blasting CO2 EX 15:50
15:08 FAC Randy EX,EY N Taking Trailer to EY & EX 17:08
15:09 VAC Janos FTCE N Counting Particles 15:21
15:10 FAC Cindy HAM Shaq N Technical Cleaning and recycling Cardboard 17:10
15:11 FAC Kim EX N Technical Cleaning 16:30
15:12 FAC Karen EY N Technical Cleaning 16:30
15:22 VAC Janos Travis Mid X and EX N Vacuum Work 17:22
15:23 EE FIL CER N ITMX Coil driver work needs SUS and HEPI SAFE 15:42
15:30 CDS Dave B. Remote N Picket Fence work 17:30
15:31 VAC Jordan Gerardo FTCE N Ion Pump install 18:31
15:32 Tour Matt H & Co FTCE & LVEA N RAL Tour 16:52
15:35 PSL Jason CtrlRm N PSL Refcav tuning 15:39
15:36 PEM Robert PSL YES Tuning Periscope Resonate Freq 17:36
15:45 EE Fil & Marc LVEA N PEM Inventory 17:17
15:52 FAC Tyler & Mc Miller EY N Chiller Maintenance. 18:02
16:01 SQZ Shelia & Vicky SQZt0&7 LOCAL Homodyne Alignment 19:17
16:22 SQZ Jeff, Regina & Doortea LVEA LOCAL Crashing the RAL Party and Joinin SQZrs 16:49
16:41 PEM Fil MIDX N Looking for part numbers 17:01
16:47 OMC Keita HAM6 N Plugging in Beckhoff cable to OM2 16:50
16:59 RAL Matt H &Co Roof N RAL Tour to Roof 17:17
17:01 SQZ Camilla & Doortea LVEA SQZt0 LOCAL Helping Sheila & Vicki with SQZ work 19:26
17:04 FAC Kim & Karen LVEA N Technical Cleaning 18:48
17:48 Hartman Camilla LVEA YES LASER HAZARD TRANSITION 19:33
18:03 VAC Travis & janos LVEA Yes VAC Work with Laser Haz Goggles. 18:04
18:24 EE Marc & Fil ISCT1 Yes Documenting Cabling at ISCT1 18:47
18:26 OM2 keita HAM6 yes Undoing the  Beckhoff and OM2 Changes this morning 18:27
18:56 VAC Jordan BSC3 YES Opening FIlter Cav Gate valve 19:11
19:53 VAC Travis Mid Y N Vacuum work 21:23
19:56 PEM Robert PSL AntiRoom No Checking PSL AC For proper Functionality 20:12
19:57 SQZ Sheila & Camilla SQZt7 Local Touching up SQZ settings 20:27
20:29 FAC Mitchel Mechanical Room N Checking HEPI Pumps and Dust Monitors 20:59