thomas.shaffer@LIGO.ORG - posted 15:56, Wednesday 11 October 2023 (73391)
Ops Day Shift Summary

TITLE: 10/11 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Lock loss at the immediate start of this day shift, but automated relock. There was some commissioning time starting at 12 PT that also caused a lock loss at 2123UTC. A 6.4M earthquake and a higher microseism have made reacquition a bit slower. I'm currently going through an initial alignment to hopefully help.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:37 FAC Karen Mid Y N Technical Cleaning and DeBugging 16:49
16:02 FAC Kim Mid X N Technical Cleaning & Debugging 16:44
16:39 HVAC Tyler AirHandler1 N Checking On Air Handler 16:48
20:18 FAC Tyler Mid X & MidY N Checking Chiller line Pressures and Inventory 20:42