TITLE: 10/11 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Lock loss at the immediate start of this day shift, but automated relock. There was some commissioning time starting at 12 PT that also caused a lock loss at 2123UTC. A 6.4M earthquake and a higher microseism have made reacquition a bit slower. I'm currently going through an initial alignment to hopefully help.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:37 | FAC | Karen | Mid Y | N | Technical Cleaning and DeBugging | 16:49 |
| 16:02 | FAC | Kim | Mid X | N | Technical Cleaning & Debugging | 16:44 |
| 16:39 | HVAC | Tyler | AirHandler1 | N | Checking On Air Handler | 16:48 |
| 20:18 | FAC | Tyler | Mid X & MidY | N | Checking Chiller line Pressures and Inventory | 20:42 |