Reports until 17:03, Monday 18 April 2011
H2 INS
michael.rodruck@LIGO.ORG - posted 17:03, Monday 18 April 2011 (734)
H2 PSL installation

Today the contractors installed insulation on the roof, later covering this with another layer of sheetrock. Aluminum standoffs were also installed on the 4 sides of the building - the floating exterior wall will attach to these.

As Dani mentioned, dust levels remain normal. One week trend is attached.