TITLE: 10/12 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Two mystery locklosses with some opportunistic commissioning activities interspersed throughout the shift since L1 has been down.
HWS ITMX code is stopped and has been for the majority of this shift, tagging TCS.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 23:48 | PEM | Robert | CER | - | Adjust PSL chassis grounding | 23:57 |
| 00:28 | SQZ | Vicky, Naoki, Regina | CR | - | SQZ tests | 01:57 |