OPS Monday day shift summary

TITLE: 10/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
INCOMING OPERATOR: Austin
SHIFT SUMMARY:

We dropped out of Observing to reverse the previously (last week, alog73445) done ring heater changes in 2 steps 2 hours apart, first step was done from 20:39:51 - 20:40:23UTC, the second was from 22:41:46 - 22:24:19UTC. alog73503

The wind has started to pick up over the past 2 hours, gusts up to 35mph which is probably what's degrading our range over the same timeframe, and microseism remains slightly elevated.

LOG:                                                                                                  

Start Time System Name Location Lazer_Haz Task Time End
14:15 FAC Tyler EY N Glycol things 14:20
15:27 FAC Karen Woodshop N Tech clean 15:43
15:43 FAC Karen Optics lab, vap prep N Tech clean 16:03
16:30 FAC Kim & Karen FCES N Tech clean 18:42
16:42 VAC Jordan, Travis, Mitchell, Janos FCES N Prep for tomorrow, move cleanroom 18:44
17:17 VAC Gerardo FCES N Join team 18:47
19:02 FAC Kim & Karen FCES N Tech clean 20:05
19:34 FAC Cindy Light bulb room N Put away light bulbs 20:27
Comments related to this report
gerardo.moreno@LIGO.ORG - 20:55, Monday 16 October 2023 (73509)DetChar, PEM, VE

The cleanroom inside the filter cavity enclosure was set above the 6 way cross (C6).  The cleanroom was turned ON at 18:03 UTC.