TITLE: 10/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 160Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
PSL 101 yellow alarm at 19:55UTC, came down after about 15 minutes.
We dropped out of observing from 22:01 to 22:03UTC for Camilla and I to adjust the OPO temperature, but unfortunately it made the range worse. Seeing LLO have a lockloss, we went out again to adjust it from 22:34 to 22:40UTC.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:30 | FAC | Kim & Karen | FCES | N | Tech clean, prep for tomorrow | 19:24 |
| 15:44 | FAC | Randy | EY | N | Inventory | 17:14 |
| 15:55 | FAC | Janos | FCES | N | Prep for tomorrow, cross installation | 17:18 |
| 16:19 | CAL | Tony & Vlad | PCAL lab | LOCAL | Check spheres | 17:19 |
| 16:22 | FAC | Tyler & Erik | EY | N | Check chiller | 16:47 |
| 16:45 | FAC | Cindy | FCT | N | Join Karen, tech clean | 18:36 |
| 17:52 | VAC | Travis, Janos | FCT | N | Turn on cleanroom | 18:00 |
| 18:50 | CAL | Tony | PCAL lab | LOCAL | Find LLO sphere | 18:54 |
| 19:16 | VAC | Janos | MidY | N | Checks | 19:31 |
| 19:24 | CAL | Tony | PCAL lab | LOCAL | PCAL work | 21:02 |
| 19:28 | VAC | Travis | Optics lab | N | Parts | 19:28 |
| 19:40 | FAC | Cindi | OSB recieving | N | Pickup cardboard | 19:50 |
| 20:08 | FAC | Tyler & Eric | High bay | N | Checks | 21:02 |