TMS tele/table was released from the support bridge, stabilizer bars were detached, all on-table cables were installed, and then the entire structure was put on a scale using Genie lift with a TMS lift tooling.
It was measured 79.5kg. Nominally it should be 82 so we'll have to add some masses.
Then we wanted to balance the entire structure on a balance bridge tooling, we had the bridge itself but it turns out that we don't have a special bolt and a pin that provide pivot point for balancing, it seems like all units are still at LLO. We're stuck, so no mating to the SUS today.
Wrote an email to Matt Heinze, if he finds them we'll be back to business.
As always, all EX TMS photographic progress is documented in Resource Space here:
https://ligoimages.mit.edu/?c=1327