Displaying report 1-1 of 1.
Reports until 16:08, Tuesday 24 October 2023
H1 General
oli.patane@LIGO.ORG - posted 16:08, Tuesday 24 October 2023 (73713)
Ops DAY Shift End

TITLE: 10/24 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Maintenance is over and we are starting the process of getting back up.

Things to keep track of:

- EY heater tripped off at some point and caused temps to drop, should be good now but keep close eye on EY temps.

- There will be an OPO TEMP SDF, but shouldn't be any other sqz diffs
LOG:

15:00UTC Detector Locked for 28.5hrs, all SUS Charge measurements ran
23:00 Starting to move back towards locking    

Start Time System Name Location Lazer_Haz Task Time End
15:03 TCS Camilla CR N CO2 Blast on ad off 15:10
15:04 FAC Karen EY n Tech clean 16:35
15:05 FAC Kim EX n Tech clean 16:21
15:07 FAC Randy EX/EY n Cleanroom moving stuff 21:10
15:11 VAC Jordan, Travis FCETube n Closing gate valves and replacing ion pump 19:27
15:15 ISC TJ CR n Moving Common CARM Gain 15:27
15:24 SQZ Vicky Remote n SQZ adjustments 15:53
15:28 PSL Jason CR n PMC alignment 15:38
15:30 VAC Janos FCEncl n Getting stuff 15:45
15:51 EE Fil LVEA n New electronics install 15:52
15:53 SQZ Sheila, Vicky CR n OMC Scans (misaligning ITMX, ETMX) 22:28
15:58 ISI Arnaud remote n ETMX tests 17:23
16:01 FAC Cindi FCES n Tech clean 17:53
16:07 TCS Camilla, TJ Mech Room n Replacing TCSX CO2 Chiller 16:56
16:18 ISI Jim CR n ISI tests (ETMY misaligned) 17:24
16:21 FAC Kim LVEA n Tech clean 18:40
16:43 TCS Camilla LVEA n Into LVEA for TCS 16:56
16:51 CDS Jonathan CER n Cloning HWS MSR disk 19:05
16:52 FAC Karen LVEA n Tech clean 18:22
17:00 HWS TJ, Camilla EX VEA YES Swap HWS 22:54
17:10 PSL Jason, Austin Optics Lab n Oplev work 18:58
17:14 FAC Chris, Eric Sitewide n Grease supply fans 17:59
17:17 DMT Dave remote no add channels to dmt epics, DAQ restart required 20:31
17:17 DAQ Dave remote no Add zotvac0 epics channels to DAQ. DAQ restart required 20:31
17:18 DAQ Dave remote no DAQ RESTART. Needed for EDC changes and new h1susprocpi model 20:31
17:24 ISI Jim CR n ETMX/ETMY tests 22:19
17:25 FAC Mitch EX/EY n Dust mon/HEPI pump checks 18:06
17:54 FAC Cindi LVEA Receiving n Getting cardboard 22:26
18:19 ISC Keita LVEA n OM2 19:17
18:28 SUS Dave remove no Restart Vlad's new h1susprocpi model, DAQ restart required 18:29
18:29 FAC Tyler, Eric LVEA n Walking floor 18:52
18:29 SUS Dave remote no Install Vlad's new h1susprocpi model, DAQ restart is required 20:31
20:03 FAC Christina OSB n Moving pallet w/ forklift 22:13
20:09 FAC Tyler, Eric FCES n Tour 20:31
20:11 ISC Keita LVEA n OM2 work 20:53
20:14 VAC Jordan, Travis, Janos FCETube n Pump swap 21:28
20:24   TJ LVEA n Looking for parts 20:49
20:32 FAC Tyler, Eric EY n Look at EY temp excursion 21:29
20:41 TCS Jason, Randy, Austin LVEA n Putting 3IFO TCSX away 20:59
21:14 HWS TJ, Camilla Optics Lab, LVEA n Looking for parts 21:35
21:30 VAC Janos EX/EY n Working with pumps 22:11
21:53 CDS Jonathan CUR n Network switching 22:54
22:05 ISC Keita CER n Measuring Beckoff voltage 22:29
22:12 VAC Janos LVEA n Pumps 22:18
Displaying report 1-1 of 1.