Reports until 16:04, Wednesday 25 October 2023
H1 General
oli.patane@LIGO.ORG - posted 16:04, Wednesday 25 October 2023 (73743)
Ops DAY Shift End

TITLE: 10/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Now Locked for 20.5 hours. Had commissioning today starting at 19:07UTC and is ongoing but wrapping up soon.
LOG:

15:00UTC Detector Locked for 12.5hours

--Commissioning Start--
19:07 Out of Observing for Commissioning
19:09 To NLN_CAL_MEAS for Calibration measurements
    - bb measurements: 1382296233 - 1382296559
    - simulines measurements: 1382296585 - 1382297917
19:39 Back to NOMINAL_LOW_NOISE
19:44 - 20:05 DARM Boost
20:08 COMM Gain
    12: 20:08:17 - 20:10:17
     6: 20:10:29 - 20:12:29
    12: 20:12:44 - 20:14:44
     6: 20:14:58 - 20:16:58
    
20:20 - PRESENT SQZ ASQZ w/different NLG      

Start Time System Name Location Lazer_Haz Task Time End
15:04 FAC Karen OpticLab/VacPrep n Tech clean 15:32
15:09 FAC Randy EY/EX n Moving boxes from EY to EX 17:09
15:32 FAC Karen MY n Tech clean 16:48
19:10 CAL Louis, Oli CR n Running calibration 19:38
19:49 OPT Jason OpticsLab y(local) Oplev work 20:15
19:44 ISC Camilla, Sheila CR n DARM Boost 20:06
20:07 ISC Oli CR n CARM gain 20:17
19:10 PI Vlad, Naoki CR n 80k PI work 21:34
20:29 FAC Eric, Tyler MX n Looking at air handler 21:59
20:20 SQZ Sheila, Camilla CR n SQZ ASQZ w/different NLG ongoing
21:23 OPT Jason, Austin Optics Lab n Oplevs 22:37