TITLE: 10/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: IFO has been locked 28h30. Just finished up a commissioning period from 20:00 to 22:55UTC
LOG:
During commissioning:
This morning we had to touch FC2 alignment when the FC unlocked 73770, but since then Naoki has adjusted the FC2 beam centering 73777 so we except this won't be an issue in the future.
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:21 | FAC | Randy | EY | N | Lab room | 17:16 |
17:40 | FAC | Randy | MY | N | MY | 19:40 |
18:02 | FAC | Kim | MX | N | Technical Cleaning | 18:33 |
18:59 | FAC | Kim | H2 | N | Technical Cleaning | 19:10 |
20:02 | ISC | Camilla | CR | N | Mich FF measured | 20:21 |
20:21 | COMM | Vlad | CR | N | PI injections 15kHz | 22:21 |
20:22 | CAL | Louis | CR | N | Calib sweeps for DARM boost | 23:00 |
21:00 | SQZ | Naoki | CR | N | Retune and FC2 centering | 23:00 |
21:03 | PCAL | Tony | PCAL lab | Local | PCAL | ????? |
21:16 | AOS | Jason, Austin | Optics Lab | N | Oplev work | 22:39 |